Per Sec.2.31 of the Inside Wireman’s Agreement All Calls Require all Journeyman to have and maintain a current/active California State Electrician Certification, OSHA 10 and CPR/First Aid Certifications. Per Sec 3.25 and 3.34 All Foreman and General Foreman are required to have and maintain a current/active California State Electrician Certification, OSHA 30, NFPA 70E and CPR/First aid Certifications
Long Calls:
2 – Journeyman Wiremen to Cupertino Electric for the Vidal 160MW AC PV/Bess project in Vidal. Report Monday December 1st at 6:00am. Job requires 2 valid forms of ID, OSHA 10, CPR/First Aid Certifications, Steel or Composite toe Boots and Dispatch in Hand. ($150 Boot stipend, See policy at orientation). This project has a pre-hire drug test. This job is Zone B working a 4/10’s schedule. Module install. State Cert is waived for this project. This Job has been filled at dispatch
1 – Journeyman Wiremen to Baker Electric to the Repair Student BEQ project in 29 Palms. Report after background check clears. (To be completed at the hall). With a normal 6:30am start time. Must have clean background and current vehicle registration and insurance. DUI offenses are subject to review by commanding officer. Job requires 2 valid forms of ID, OSHA 10, CPR/First Aide certifications. This job is working a 4/10s schedule and is zone B This call remains unfilled as of 8:48 Please Call the Hall for availability
3 – Journeyman Wiremen to Ledbetter Electric for the Toyota NAPCC Solar project in Ontario. Report Monday December 1st at 7:00am. Job Requires 2 Valid forms of ID, OSHA 10, CPR/First Aid Certifications. Approx Duration 4-6 months. These calls remain unfilled as of 8:48 Please Call the Hall for availability
3 – Journeyman Wiremen to Ledbetter Electric for the Toyota NAPCC Solar project in Ontario. Report Monday December 1st at 7:00am. Job Requires 2 Valid forms of ID, OSHA 10, CPR/First Aid Certifications. Forklift Certified with Operating Experience Approx Duration 4-6 months. These calls remain unfilled as of 8:48 Please Call the Hall for availability
1 – Journeyman Wireman to Southern Contracting for the 29 Palms WWTP Project in 29 Palms. Report after Background Check Clears possibly Wednesday December 3rd for a normal 6:00am Start time. Job requires 2 valid forms of ID OSHA 10 and CPR/First Aid Certifications. This Job is Zone B Approx Duration 2 Months. This call remains unfilled as of 8:48 Please Call the Hall for availability
Inside Short Calls:
1 – Journeyman Wireman to VFC Lightning Protection Systems for the San Bernardino County Valley Communications Center project in San Bernardino, Report after dispatch on Wednesday November 26th with a normal 6 am start time, Job requires 2 valid forms of ID, OSHA 10, CPR/First Aide certifications and will be 2-3 days. This call remains unfilled as of 8:48 Please Call the Hall for availability
4– Journeyman Wireman to Commercial Controls to the San Bernardino County Valley Communications Center Project in San Bernardino. Report after dispatch on Wednesday November 26th with a normal 6:00am start time. Job requires 2 Valid forms of ID, OSHA 10, CPR/First Aid . Duration Approx. 14 days. These calls remain unfilled as of 8:48 Please Call the Hall for availability
OUR NEXT INSIDE JOURNEYMAN SHORT CALL STARTS AT #1 ON BOOK 1
WE CURRENTLY HAVE:
72 JOURNEYMAN WIREMEN ON BOOK 1 AND 38 JOURNEYMAN WIREMEN ON BOOK 2.
6 JOURNEYMAN SOUND INSTALLER ON BOOK 1 AND 5 JOURNEYMAN SOUND INSTALLERS ON BOOK 2
0 TRAFFIC JOURNEYMEN ON BOOK 1 AND 0 TRAFFIC JOURNEYMEN ON BOOK 2
DISPATCH OFFICES OPEN AT 8AM AND DISPATCH STARTS AT 8:30AM
High Desert Dispatch Will Be Closed
14298 St Andrews Dr. Suite 8 Victorville, Ca 92395